NATIONAL – DAIRY OF EVENTS

The Public Examinations  Amendment Bill , 2026 (anti-cheating law)

  • Context:The Union Government is set to introduce the Public Examinations (Prevention of Unfair Means) Amendment Bill, 2026 in Parliament. 

About the Public Examinations  Amendment Bill, 2026

  • The Bill seeks to strengthen the existing anti-cheating law by ensuring faster investigations, speedy trials, stricter punishments, and stronger action against organised exam fraud
  • 60-day Investigation: All paper leak investigations must be completed within 60 days
  • Special Task Force (STF): Centre can deploy STF for major exam fraud cases.
  • Fast Track Courts: States must designate Special Sessions Courts for continuous trials. 
  • Time-bound Judgments: Courts must deliver judgments within 3 months of filing the chargesheet. 
  • Limited Adjournments: Hearings cannot be postponed beyond the next day without written reasons. 
  • Fast Appeals: High Court Division Bench must dispose of appeals within 90 days. Harsher Punishments: 
  • Individuals: 5–10 years imprisonment and fines up to ₹50 lakh
  • Organised crime: Minimum 7 years imprisonment and fines up to ₹10 crore
  • Service Provider Liability: Fines up to ₹5 crore, debarment up to 8 years, and 3–10 years imprisonment for involved directors/management. 

Objectives

  • Prevent paper leaks and examination malpractices
  • Ensure time-bound investigation and speedy justice
  • Deter organised cheating syndicates through stricter penalties. 
  • Protect the fairness, transparency, and credibility of public examinations.
  • Safeguard the interests of genuine candidates. 

Significance

  • Strengthens the integrity of recruitment and entrance examinations. 
  • Reduces delays in investigation and judicial proceedings. 
  • Increases accountability of coaching centres, service providers, and organised fraud networks. 
  • Enhances public confidence in the examination system. 
  • Supports merit-based selection in education and public employment. 

Key Highlights

  • Bill: Public Examinations (Prevention of Unfair Means) Amendment Bill, 2026
  • Investigation Deadline: 60 days 
  • Trial Completion: Within 3 months of chargesheet 
  • Appeal Disposal: Within 90 days 
  • Maximum Fine: ₹10 crore (for organised exam fraud) 

Focus: Speedy investigation, fast-track trials, and stringent punishment for exam-related offences.

 

Sarnath added to UNESCO Heritage List

  • Context:India’s ancient Buddhist site of Sarnath in Uttar Pradesh was on Saturday incribed on the UNESCO World Heritage List. The decision was taken during the ongoing meeting of the UNESCO World Heritage Committee’s 48th session in Busan, South Korea.

About Sarnath

  • Location: Situated near Varanasi, Uttar Pradesh
  • A major Buddhist pilgrimage centre and one of the holiest sites in Buddhism. 
  • Referred to in ancient Buddhist texts as Rishipattana, Isipatana, and Mrigadava
  • Recognised as India’s 45th UNESCO World Heritage Site and Uttar Pradesh’s 4th World Heritage Site

Significance to Buddhism

  • The place where Lord Buddha delivered his first sermon after attaining enlightenment, marking the beginning of Dharmachakra Pravartana (Turning of the Wheel of Dharma)
  • The UNESCO-listed property includes: 
    • Chaukhandi Stupa 
    • Archaeological Remains of Sarnath, including: 
      • Dhamekh Stupa 
      • Dharmarajika Stupa 
      • Mulagandhakuti Vihara 
      • Ashokan Pillar 
  • Sarnath flourished over centuries with support from kings, Buddhist monasteries, and devotees
  • The monuments represent continuous development from the pre-Mauryan period (5th–4th century BCE) to the 12th century CE
  • Extensive excavations by the Archaeological Survey of India (ASI) have revealed a 16-century-long cultural sequence, reflecting the site’s rich historical and religious heritage. 

The Ken-Betwa project

  • Context: Experts recently flagged concerns over the construction work for the Ken-Betwa river linking project going on in the Panna Tiger Reserve in Madhya Pradesh, citing a severe impact on the wildlife population inside the reserve.

About Ken-Betwa Link Project

  • It is a river interlinking project designed to transfer surplus water from the Ken River (Madhya Pradesh) to the water-scarce Betwa basin (Uttar Pradesh), both tributaries of the Yamuna.
  • It is expected to bring prosperity to the drought-prone Bundelkhand region.
  • Phase I of the project involves the construction of the Daudhan Dam in Madhya Pradesh, a 77-meter-high structure, and a 221 km long canal, including a 2 km tunnel, to move water efficiently. 
  • The project will also generate 103 MW of hydropower and 27 MW of solar power.
  • The project will utilize 4,543.52 MCM of water, benefiting Madhya Pradesh (2,350 MCM) and Uttar Pradesh (1,700 MCM) for irrigation, drinking water, and industrial use.
  • Phase II of the project includes the Lower Orr Dam, Kotha Barrage, and Bina Complex Projects to enhance water availability.
  • A significant concern is the impact on Panna Tiger Reserve, as nearly 6,000 hectares of its core area will be submerged due to the dam construction, affecting wildlife habitats
Next NATIONAL - DIARY OF EVENTS >